Second floor walls are going up. The hallway is straight ahead. Worship Falls is on the left and the teacher's room is on the right. You can see the sprinkler pipe running through the wall sections just above the future ceiling in the hallway.
This is the wall on the north side of the hallway outside the looking glass theater. The door is the electrical equipment closet. Again the sprinkler line is run down the hallway just above the ceiling in the hallway.



No comments:
Post a Comment