The CT cabinet was installed on the outside wall.
This is the box that all the power from the transformer outside gets into the building and the place that the meter is connected too. It is the gray box in the center of the picture.
2009 Expansion Project by Kansas City Baptist Temple and the information recorded by Leon Hatt the Facility Director.
No comments:
Post a Comment