Now that the snow is good and the base roof material is dry the top material "TPO" is being laid while the weather will allow. Looking North with Temple 2 in the background.
Getting the larger upper roof material laid out. Looking South with the tower and the upper parking lot in the distance.



No comments:
Post a Comment