Wednesday, August 5, 2009

Storm Line Continues


Johnny digging and opening a hole in the storm drain in the North driveway to connect the drain pipe.



Johnny is spreading in concrete in the storm inlet box to form an invert to allow the water to drain out of the box into the storm pipe.



Connecting the concrete pipe that will be under the North driveway loading dock area.



Connecting it to an area inlet box by the loading dock area.

No comments:

Post a Comment