This is a section of the west wall footing with rebar in place and ready to pour concrete.

This is another section of the East wall footing just outside the conference room window (currently the bookstore).

This is a section of the footing alone the North wall just West of the new loading dock.

The above picture is a section of the footing that was dug just outside the old bookstore doors.

The above picture is after digging a portion on the footing on the East side and setting the rebar is place so that they can pour concrete.

The above picture is of the East wall footing after pouring concrete