New sign on SE corner of building.
Signs giving directions.
South door to bookstore is finished with new sod installed today.
Sod installed and curb painted and labeled.
Shuttle bus sign and crosswalk painted. Sod also in place.
Main entrance and all details in place.
Patio with 4 round tables.
The Fred Land park bench at the bus stop.
Ramp to upper parking area with new sod and bushes by stairs.
Handicapped parking with signs, bushes and rocks.
Grass on the end island of handicapped parking area.
West side with entrance doors and lots of windows.
Another view of entry with canopy with support rods.
Ramp out of the upper parking area with hand rail and rock edging.
Tree and grass from parking lot out to 55th street.
Retaining wall with rock edging.
Retaining wall has rocks on both sides and trees line the driveway.
Sign at top of drive point to the parking lot below.
Top of the driveway and retaining wall with parking below.
Another view of the west side of building with grass and trees in view.
West side of building with windows and new grass.
No comments:
Post a Comment