Place the transformer on the pad .
Wires going to the building (black) on the right side and the main feed cables with copper showing on the left.
Meter set beside the CT cabinet.
In place and ready to be finished in the morning.
2009 Expansion Project by Kansas City Baptist Temple and the information recorded by Leon Hatt the Facility Director.
No comments:
Post a Comment