Thursday, November 12, 2009

Getting ready to pour floor


The corridor on second floor just outside the elevator.

Wire mesh and rebar in place for concrete.

Nelson Studs to connect the steel to the concrete.

Over looking the foyer from the second floor corridor.

No comments:

Post a Comment