The corridor on second floor just outside the elevator.
Wire mesh and rebar in place for concrete.
Nelson Studs to connect the steel to the concrete.
Over looking the foyer from the second floor corridor.
2009 Expansion Project by Kansas City Baptist Temple and the information recorded by Leon Hatt the Facility Director.
No comments:
Post a Comment