I used the time lapse camera and moved it to take the above picture
that shows the complete elevator shaft that the masons put up.
The six columns are the area of the high ceiling for the new foyer and
you can see how tall the foyer will be. The black material is the water
proofing that is applied prior to back filling which is next. If you look
real close on the right side you can see the orange supports on the wall
that is needed prior to the back filling to keep from pushing the wall in.
No comments:
Post a Comment