Below is the last step on the patch with steel plates coving the asphalt.

Below is the sewer inspection pit with a cap on the end to the building. This is a city required item for them to be able to inspect what is going into the sewer system.

Below is the last section of the storm drain in phase one with the inlet box just west of the driveway. Terry has his foot on the drain pipe. He is one of the workers for Kissick.

We also had Kissick to help put the power poles in with their track hoe.

Still hoping that we can get the phase one site utilities done this week.