Friday, June 26, 2009

Hot & Concrete


The words for today are HOT and CONCRETE as that is what happened today.
The north driveway was patched by Blue Ridge Cutoff


The driveway of the South Side was poured back, a section that was removed and put back at a different level and with out the storm drain.


The stairs outside the Bookstore were poured today and the forms removed.

No comments:

Post a Comment