Thursday, June 11, 2009

Electrical Service


This week Westhues (Jason) dug a hole under the electrical transformer to open the space needed to run a large condut to the new transformer site.


This is the site of the new transformer pad that will be poured in concrete.


After the latest rain storm. KCP&L was able to connect up the power so we have power to the camera, job trailer and parking lot lights. See the previous post and the wires are not connected to the street.

No comments:

Post a Comment