Monday, December 27, 2010

Moved Location

I have moved the location of my blog:

http://facilities.kcbt.org/

Thanks for following along.

Friday, July 23, 2010

Final Aerial Photos

From the East looking West.
From West looking East.
From the South looking North.

Friday, July 16, 2010

Outside Finished

New sign on SE corner of building.
Signs giving directions.
South door to bookstore is finished with new sod installed today.
Sod installed and curb painted and labeled.
Shuttle bus sign and crosswalk painted. Sod also in place.
Main entrance and all details in place.
Patio with 4 round tables.
The Fred Land park bench at the bus stop.
Ramp to upper parking area with new sod and bushes by stairs.
Handicapped parking with signs, bushes and rocks.
Grass on the end island of handicapped parking area.
West side with entrance doors and lots of windows.
Another view of entry with canopy with support rods.
Ramp out of the upper parking area with hand rail and rock edging.
Tree and grass from parking lot out to 55th street.
Retaining wall with rock edging.

Retaining wall has rocks on both sides and trees line the driveway.
Sign at top of drive point to the parking lot below.
Top of the driveway and retaining wall with parking below.
Another view of the west side of building with grass and trees in view.
West side of building with windows and new grass.

Thursday, July 15, 2010

Openning Day

Opening day and what a day!
Major rain storm and we tested the emergency system with a power fail.
Seams like everyone loved it!

Saturday, July 10, 2010

Ready to open doors

Welcome center and slide in the distance.
Children's Check in area.
Pre-School Hallway, Restrooms and sitting area.
Sitting area outside the restrooms on west side.
Entry area and escalators.
Portico in the final stages of getting ready.
Bookstore extending area.

Friday, July 2, 2010

Welcome Center

Welcome center received the top today.
Another view with all the carpet around the tiled area.

Parking Lot

New Asphalt with white lines for vistor parking spaces.
Yellow parking stalls with white in the distance.
Green will be for "Special Needs"
Asphalt on the North West side of the building.
New asphalt before the stripping of lines.

West side

West side sidewalk was poured with colored concrete.

Patio

This week the colored concrete for the patio was poured.

Friday, June 25, 2010

Murals on Wall

Outside the door of Looking Glass Theater.

Mural outside art room (Creation Cave).

Cafe

Ice Machine and stainless steel top installed.


Cafe tops and equipment in place.

Exterior Lights

Night Lighting under the canopy.

Friday, June 18, 2010